After our greenhouses in Marcellus were flooded in May 2018, we started again from scratch in Castelnau-sur-Gupie. Here is the building work, in photos, from 2020 to 2023.

May 2020: a meadow in Castelnau-sur-Gupie

In May 2018, a flood swept through our greenhouses in Marcellus and our home. We chose to start again elsewhere, on a larger and safer site: the Castelnau-sur-Gupie estate, in Lot-et-Garonne. The full story is told in About the nursery.

In May 2020, before the work began, the land was still just mown meadows, hedges and tall trees.

Mown meadow and trees on the Castelnau-sur-Gupie land in May 2020
May 2020: the land before the work.
Small valley lined with hedges on the Castelnau-sur-Gupie land
A small valley lined with hedges.
View over the valley from the Castelnau-sur-Gupie land
The view over the valley.
Meadow and fruit trees on the Castelnau-sur-Gupie land
The meadow and its trees.
Orange stake in the meadow
The first stakes in the meadow.

June 2020: the earthworks begin

Everything was built with our own hands, at weekends and during holidays, alongside our jobs. In June 2020, the meadow was mown. On 29 June, an excavator arrived: the topsoil was stripped and piled up.

Mown meadow on the Castelnau-sur-Gupie land
20 June 2020: the mown meadow.
Orange excavator in the meadow
29 June 2020: the excavator arrives.
Excavator stripping the meadow topsoil
The earthworks begin.
Excavator bucket at the edge of the stripped ground
The topsoil is stripped.
Excavator and heaps of soil on the site
The heaps of soil pile up.
Large stripped area with a surveying tripod
30 June 2020: the stripped ground.

July 2020: levelled ground and the first materials

In early July, the ground was levelled and staked out, and the layout was marked on the ground with orange spray paint. Then the greenhouse parts arrived.

Stripped ground with an orange stake
2 July 2020: the ground staked out.
Levelled ground, excavator in the background
The levelled ground.
Dug-out site of the future bog garden, machinery in the background
The site of the future bog garden.
Levelled ground with a puddle
The levelled ground, after the rain.
Soil bank along the stripped ground
The bank along the edge of the site.
Orange spray-paint layout on the ground
3 July 2020: the layout on the ground.
Lorry loaded with greenhouse hoops
The greenhouse hoops arrive by lorry.
Greenhouse frame parts stored in the garage
The frame parts, waiting to be assembled.
Levelled ground with a mini excavator and ground anchors
The levelled ground, with the first anchors in place.
Greenhouse tubes and tractor on the levelled ground
The tubes are laid out across the site.

August 2020: the greenhouses go up

In August, the hoops were raised one by one, then assembled: the outline of the first tunnels appeared.

Telehandler lifting a greenhouse hoop
The hoops are lifted with a telehandler.
Greenhouse hoops set up on the site
The first hoops in place.
Complete frame of a polytunnel
A tunnel frame, complete.

Autumn 2020: the water tank and the first covered tunnel

In autumn, the excavator prepared the ground, a large water tank was built on its round base, and the first tunnel got its cover.

Excavator digging on the site
September 2020: earthworks.
Round base prepared for the water tank
The base of the water tank.
Corrugated steel water tank being assembled, two children inside
17 October 2020: the water tank being assembled.
Corrugated steel water tank built
October 2020: the water tank is up.
Covered polytunnel
The first covered tunnel.
Site entrance graded from the road
5 September 2020: the entrance from the road.
Inside a greenhouse with sheeted floor and a heater
1 November 2020: the sheeted floor and the heater.

Autumn and winter were wet: we often worked in the mud.

Muddy ground staked out for a new greenhouse
28 November 2020: the site of a new greenhouse, in the mud.
Y-shaped greenhouse posts set in the mud
13 December 2020: the frame posts.
Pit filled with rainwater near greenhouse hoops
The rain fills the hollows on the site.
Ventilation ducts and electrical boxes in a greenhouse
30 December 2020: the ducts and the electrical boxes.

End of 2020: the plants move in

In November, the wooden chalet joined the water tank and the greenhouses, and the Sarracenia moved into the first tunnel. In December, we built the benches, put up a new tunnel and installed the electricity.

Wooden chalet, water tank and greenhouses at the nursery
November 2020: the chalet, the water tank and the greenhouses.
Dormant Sarracenia in a polytunnel
The Sarracenia in the first tunnel.
Mesh bench being built in a greenhouse
December 2020: the first mesh benches.
Hoops of a new tunnel in winter
A new tunnel going up.
Electrical boxes and climate control in a greenhouse
The electrical boxes and the climate control.

2021: fitting out the greenhouses

In early 2021, the greenhouses got their growing benches, assembled and levelled one by one. They filled up with plants. In spring, ventilation and water treatment equipment completed the setup: our plants are watered with reverse-osmosis water, and also with rainwater collected in our water tank.

Articulated lorry loaded with growing benches
28 January 2021: the benches arrive by articulated lorry.
Growing bench frames stacked on the site
The bench frames, unloaded.
Metal growing benches being assembled in a greenhouse
January 2021: assembling the growing benches.
Finished growing benches in a greenhouse
February 2021: the benches are finished.
Aluminium growing benches on muddy ground
12 February 2021: the benches in place, feet in the mud.
Electrical boxes being wired in a greenhouse
14 March 2021: wiring the electrical boxes.
Large extractor fans and a mesh bench in a greenhouse
20 March 2021: the extractor fans.
Greenhouse full of potted carnivorous plants
The greenhouse fills up with plants.
Large fan installed in a greenhouse
March 2021: the ventilation.
Water treatment equipment
April 2021: the water treatment.
Water treatment control panel
The water treatment control panel.
The nursery water treatment equipment
The water treatment equipment.

2021 to 2022: the nursery grows

The work carried on: wooden benches, a concrete slab and a new greenhouse in summer 2021, benches on mulch, plants grown under lights. In 2022, a green ground cover was laid between stakes, the paths were compacted and the nursery took on its present look.

Wooden bench being built in a greenhouse
April 2021: a wooden bench.
Concrete slab poured on the site
July 2021: a concrete slab.
Frame of a new polytunnel
A new greenhouse goes up.
Growing benches set on bark mulch
Benches set on bark mulch.
Carnivorous plants grown under lights
December 2021: plants under lights.
Inside a large empty multi-span greenhouse, earth floor
A large greenhouse, before fitting out.
Roof vent of a polytunnel
A roof vent for airflow.
Metal frame of a room built inside a greenhouse
27 December 2021: the frame of a room.
Wooden benches being built on ground cover
29 December 2021: wooden benches.
Wooden office with a floor in the lower greenhouse
16 February 2022: the office in the lower greenhouse and its floor.
Green ground cover laid between stakes at the nursery
April 2022: a green ground cover is laid.
Machinery compacting a gravel path
June 2022: the paths are compacted.
Gravel car park shaded by trees
6 June 2022: the gravel car park.
Gravel path between the greenhouses
The path between the greenhouses.
Gravel path and greenhouses at the Cédric Carnivores nursery
July 2022: the nursery and its paths.

Today the nursery has three greenhouses: the largest for temperate plants, the middle one, fitted with cooling, for tropical plants, and the lower one for the office, reception and sales.

2023: new equipment

The work did not stop there. In May 2023, pallets of equipment arrived, and cooling pads were installed along the tropical greenhouse.

Pallets of equipment delivered to the nursery
26 May 2023: the equipment is delivered.
Cooling pad wall installed in a carnivorous plant greenhouse
29 May 2023: the cooling pad wall, seen from inside.
Cooling pad wall along a greenhouse, seen from outside
The same wall, seen from outside.

Our plants can be bought on site, at the nursery, or online: our Sarracenia collection. The building of the bog garden is told in The nursery bog garden: the build in photos.

A question about the nursery?

✉ Contact us

© 2026 Cédric Carnivores - Carnivorous plant nursery since 2012